2013 DOM
1.5T F2000 magnet
S30 RF amp & Copley 781 gradients
8 channel RF
Z400 CPU running 3.2.3 Operator SW
Coils included: 8ch Head, 8ch CTL Spine, 4ch Shoulder, 4ch Knee, 4ch Body array, and a Loop coil.
Ground floor rig-out
Ground level KKT chiller
The system is still installed, used clinically daily
Available in the Nov/Dec 2024 timeframe, East Coast location
Photos available upon request
Return Policy
Items are sold as-is with no returns or refunds available unless explicitly stated.