|
2000 Marconi Eclipse PD250, 1.5 T, Fixed site, Cold, gradient: 27 mT/m, Slew Rate 72 mT/m/ms, software release: VIA 2.0, reconstruction speed 50 IPS, COILS: Quadratrure Head, C/T/L spine phased array, Quadrature Lower Extremity, Small Joint with Positioner, PA Shoulder, PA Flex Body, Bi-Lateral Breast, PA Head/Neck (ATLAS), Software: MR TOF & Phase Contrast Angio Package iPass Bolus Tracking, Fast Spin Echo, / Fast Spin Echo Booster, Express Single Shot FSE, Echo Planar Imaging, Cardiac Cine Imaging Package, Host workstation is missing from the unit. Was working Properly prior resent DeInstall. Available now.
|